Problem: The U.S. Air Force faces an urgent and growing gap in its ability to rapidly harden, repair, and reconstitute expeditionary airbase infrastructure during combat operations. Recent attacks against airbase infrastructure in the Middle East have reinforced a reality already evident in planning for the Indo-Pacific and other contested theaters: U.S. forces must be able to operate from bases that are vulnerable to missiles, rockets, artillery, one-way unmanned aircraft, and fragmentation-producing weapons. Current expeditionary infrastructure is often too slow to construct, too logistics-intensive to transport, or too lightly protected to provide meaningful survivability under modern attack conditions. Put bluntly, the Air Force has spent decades building exquisite kill chains while too often housing the Airmen who sustain them in tents, trailers, and flat-walled structures that were never designed for the threat environment now arriving overhead.Opportunity: 3D concrete printing offers a potential step-change in expeditionary construction by enabling military engineers to rapidly print protective structures using automated or semi-automated construction workflows, reduced skilled labor, and locally available cementitious materials where feasible. Prior work has demonstrated that cementitious materials can be printed, that full-scale structures can be produced with mobile 3DCP systems, and that limited blast testing can be performed on printed wall assemblies. However, the existing state of the art has not yet fully addressed the combined problem that matters most for combat survivability: printable expeditionary materials, field-executable operator workflows, and structure geometry deliberately optimized to mitigate blast-wave behavior and fragmentation effects.This Direct-to-Phase II effort will improve the current DoD technological state by integrating three related areas of technical development: advanced cementitious materials suitable for expeditionary printing; mobile, field-operable 3D concrete printing systems and workflows; and printable protective geometries designed to mitigate blast and fragmentation effects. First, the project will evaluate advanced cementitious materials, including Air Force Civil Engineer Center-developed materials and other candidate mixes, for printability, strength gain, curing behavior, environmental tolerance, pumpability, layer adhesion, and compatibility with native or in situ material sourcing. Second, the effort will develop and evaluate novel printable geometries that improve survivability beyond conventional flat-wall construction, including shapes intended to reduce blast reflection, limit pressure amplification, interrupt fragmentation paths, and improve internal occupant protection. Third, the project will validate these material and geometry combinations through representative printing, structural evaluation, and controlled blast/fragmentation testing.The initial technology readiness level is estimated at TRL 5, with discrete material, printer, and structure demonstrations approaching TRL 6. The current manufacturing readiness level is estimated at MRL 4 to 5, because the underlying processes exist but require maturation for repeatable production in austere conditions by lightly trained military personnel. The target at the end of Phase II is TRL 6 to 7 and MRL 5 to 6, supported by relevant-environment demonstrations, printed test articles, validated print parameters, documented material performance, and blast-response data suitable for transition planning.The required Phase II effort will include material screening and characterization; evaluation of locally sourced or partially substituted cementitious feedstocks; printability testing under relevant environmental conditions; development of candidate protective geometries; computational modeling of blast interaction and fragmentation exposure; printing of representative components and structure sections; controlled structural, blast, and fragmentation testing; operator workflow development; logistics and deployment analysis; and documentation of design rules, print parameters, safety considerations, and transition recommendations.Minimum deliverables will include a material characterization report; a printability and expeditionary logistics assessment; a geometry design and modeling report; representative printed test articles; blast and fragmentation test results; validated print parameters for selected material/geometry combinations; operator-ready draft technical procedures; and a final transition package identifying recommended use cases, limitations, equipment requirements, training requirements, and follow-on test needs.The desired outcome is a validated technical foundation for rapidly printed protective infrastructure that can be employed by Air Force civil engineers in expeditionary and combat environments. A successful effort will not replace all conventional construction, but it may give commanders a faster and more survivable option when the choice is currently between slow construction, vulnerable temporary shelters, or telling Airmen to make do with whatever was shipped before the shooting started.
Program: SBIR, Phase I and Phase II Agency: Department of War, Air Force Topic number: DAF27BZ02-DV024 Solicitation: 27.BZ Released November 4, 2026; proposals accepted from December 2, 2026 Closes January 6, 2027. Check the official solicitation for the exact due time. Award type: contract, not a grant. Official solicitation: https://www.dodsbirsttr.mil/topics-app/ Listed on SBIR.gov: https://www.sbir.gov/topics/13074. SBIR.gov copies agency solicitations and can lag behind them; the official solicitation is the final word.